Anticipation continued....
July 31st (2012) was supposed to be the day that the new rig was completed. However there are a couple of items missing and described as "on backorder". One that is not critical to the building of the rig but certainly important is furniture. They did not elaborate exactly which pieces of furniture were missing but it does not matter, it all has to be there before I will be able to take delivery.
Another item that is way more critical that is missing are air conditioners. They have known for months that this rig was being built and that A/C's were part of the deal. What is up with this? Some kind of a run on RV A/C's? I did not know that the RV manufacturing business had picked up so well. Anyway, there are two large holes in the roof with wires and ducting hanging there with nothing to plug into.
We have slipped our schedule out by one week for going to Kansas to do the pick up of the rig. Maybe this will work out for the best and the heat wave will break and temps in Kansas will get below 105°.
Another item that is way more critical that is missing are air conditioners. They have known for months that this rig was being built and that A/C's were part of the deal. What is up with this? Some kind of a run on RV A/C's? I did not know that the RV manufacturing business had picked up so well. Anyway, there are two large holes in the roof with wires and ducting hanging there with nothing to plug into.
We have slipped our schedule out by one week for going to Kansas to do the pick up of the rig. Maybe this will work out for the best and the heat wave will break and temps in Kansas will get below 105°.